double girder bridge crane is the most widely used handling machinery currently. Characterized by reasonable structure, easy to operation and low maintenance, this kind of crane is widely used in plant, warehouse and workshop for material lifting and moving. Working duty ranges from A5-A7 which...
double girder bridge crane is the most widely used handling machinery currently. Characterized by reasonable structure, easy to operation and low maintenance, this kind of crane is widely used in plant, warehouse and workshop for material lifting and moving. Working duty ranges from A5-A7 which meets different requirement of clients.
The crane is composed of box bridge,running gear of crane. trolley and electrical devise. Several insulating appartus are mounted at proper parts of the crane, trolley and electrical device. Several insulating apparatus are mounted at proper parts of the crane to prevent the electric current of the energized equipment transimtting to the crane through the lifting hook during operation, which will endanger the driver's life and the safety of equipments. The crane is heavy-duty. Dual actuator is equipped with the main mechanism for the purpose of safe hoisting.
Main mechanical parts: bridge, running gear of crane, trolley and electrical device etc.
Electrical parts: Long traveling engines, lifting engines, cross traveling engines, electric control box, limit switches, overload limiter.
Cab room: There are three kinds of method for entering the platform of cab: from the side, from the end and from the top.
electric universal bridge crane is suitable for industrial and mining enterprises, workshop or open space. Lifting equipment for loading, unloading and transporting materials in a fixed span, It is mainly applicable to the auxiliary lifting operations of mechanical processing and assembly workshops, metal structure workshops, machinery maintenance workshops, various warehouses, metallurgy and foundry workshops, etc.
European type double girder overhead crane can be used as high working class such as A6 A7, used in more complex and harsh working conditions, good performance and high efficiency, more stable with heavy weight, long time working, easy maintenance, can be equipped with a variety of special slings for special operations, rain proof protection when used outside, lifting mechanism can provide two sets of safety devices as required to increase reliability. The vision of the cab room is wide, all the mechanisms are operated in the cab room, and the work is comfortable and flexible.
1.How about the delivery time?
Hoist: 15 days
single girder crane: 25 days
double girder crane: 40 days
Nonstandard design cranes: above 50 days.
2. What kind of payments do you support?
T/T, L/C, Western Union,Paypal, Trade assurance.
3.What is Trade assurance?
Trade Assurance is a free payment protection service for buyers.The service is offered by participating suppliers, and is designed to protect your payment if your order is not shipped on time, or if the pre-shipment product quality (optional) does not match the terms agreed on your contract.Your payment is protected up to 100% of an amount - agreed between you and the supplier - called the Trade Assurance Order Amount.
4.What is the MOQ?
Generally speaking, the MOQ is 1 set, Different products have different MOQ, pls contact with us.
5.Can you produce according to customer's requirements?
Yes, of course, we are professional manufacturer, need tell us the lifting height, load capacity and span. we accept non standard design and manufacturing.
6.How about the warranty?
Our warranty is 1 year, within 1 year, any questions, we send spare parts as free.
Hot Tags: double girder top running overhead cranes, China, factory, manufacturers, suppliers, made in China