banner
Home > Knowledge > Content
Products Categories
Contact Us

Henan Kino Cranes Co., Ltd

No.730, Xinghai Center, Hongqi District, Xinxiang, Henan, China

Tel: +86-373-3809941

M/P: +86-15993036980

E-mail: inquiry@kinocranes.com

Official Website: www.kinocranes.com

Operating procedures for Gantry and bridge cranes

Aug 04, 2017

1. The laying of the crane Subgrade and track shall conform to the factory requirement, and the rail grounding resistance shall not exceed 4 Ω.

2. The use of cable gantry crane, should be equipped with cable reel, distribution box should be set in the middle of the track.

3. A crane with a sliding line shall be marked with a distinctive color at both ends of the sliding line and the skid line shall be installed with a protective railing.

4. The track should be straight, the tail plate connection bolts should not be loose, the track and the crane operation range should be barrier-free, the gantry crane should loosen the clamp rail device.


Related Industry Knowledge

Related Products