banner
Home > Knowledge > Content
Products Categories
Contact Us

Henan Kino Cranes Co., Ltd

No.730, Xinghai Center, Hongqi District, Xinxiang, Henan, China

Tel: +86-373-3809941

M/P: +86-15993036980

E-mail: inquiry@kinocranes.com

Official Website: www.kinocranes.com

Precautions for rail cranes before work

Aug 04, 2017

(1) Check the Walking section, lifting device, transmission device, lighting equipment, sign lamp, whistle should be intact.

(2) Check the movement and rotation of the parts and bearings of the lubrication and oil equipment should be good, and appropriate to oil.

(3) Coal, oil, water should be sufficient.

(4) The function of barometer, water meter, safety valve and feedwater device should be good.

(5) Check the brake device should be flexible and reliable, sand box should have enough sand.


Related Industry Knowledge

Related Products