Henan Kino Cranes Co., Ltd
No.730, Xinghai Center, Hongqi District, Xinxiang, Henan, China
Tel: +86-373-3809941
M/P: +86-15993036980
E-mail: inquiry@kinocranes.com
Official Website: www.kinocranes.com
Line is mainly horizontal plane over the construction site of lifting hoisting equipment, due to the structure and the bridge shape is very similar to hence the name.
Line hanging because of the advantage is not affected by the ground object block, and become one of the most used lifting equipment.
Line hanging construction should pay attention to what peace details?
Line 1: ensure safe construction, must do a good job in maintenance goes to prevent damage of parts because of the improper care.
Outdoor equipment should open the motor cover, ensure sufficient oil, water, etc.
2: before construction should carry on the no-load and load test, if discovery is unusual failure after need to disposal, in order to be put to work.
Three: such as the construction process of present oil temperature is too high, too low, the cooling system water boiled, brake failure, such as abnormal situation, construction personnel should master the emergency measures to minimize losses.
Four: construction personnel requirements must strictly abide by rules of safe operation, construction site are not allowed to prevent corrosive items around.
Such as visibility, abnormal natural disasters affect construction cannot undertake the construction.