banner
Products Categories
Contact Us

Henan Kino Cranes Co., Ltd

No.730, Xinghai Center, Hongqi District, Xinxiang, Henan, China

Tel: +86-373-3809941

M/P: +86-15993036980

E-mail: inquiry@kinocranes.com

Official Website: www.kinocranes.com

Full or Half Automatic Control WTE Crane Grab Crane for Waste To Energy Plants

Full or Half Automatic Control WTE Crane Grab Crane for Waste To Energy Plants

Energy from Waste Grab Cranes and Biofuel Handling lifting equipment are installed in most incineration plants are fitted with a hydraulic and rope (Orange Peel or Clamshell) grabs to transport material from the storage bunker into the incinerator.

Send InquiryChat Now

grab crane for waste

Full or Half Automatic Control WTE Crane Grab Crane for Waste To Energy Plants

I. Product Introduction

Energy from Waste Grab Cranes and Biofuel Handling lifting equipment are installed in most incineration plants are fitted with a hydraulic and rope (Orange Peel or Clamshell) grabs to transport material from the storage bunker into the incinerator. To ensure there is a constant flow of material to burn, the incinerator grab crane has a high usage, RHC Lifting offers high duty ratings, full and semi automated control system to remove operator fatigue, increase positioning accuracy, productivity and safety, whilst reducing operation costs.

Through an interactive Crane Process Management programme, data is displayed on a user friendly interface showing; bunker fill level calculations, weight protocols and cranes locations. Data can be extracted and incorporated into the production process.

II. Product Parameter

Lifting Capacity (t)
5t
10t
16t
20t
Span (m)
10.5-31.5m
Speed
(m/min)
Lifting
40.1
40.7
41.8
48.6
Traveling of Trolley
44.6
45.6
43.2
Traveling of Crane
93.7/86.4
76/89
89/87.3
87.3
Operational Model
Cabin; remote control
Working Duty
A6
Steel track recommended
43kg/m or QU70
Power Supply
Three-phase A.C. 380V, 50Hz

III. Product Features

1. When purchasing your garbage handling cranes, you have to know the main parameters of the Grab garbage crane such as productivity, lifting capacity, grab volume, working duty, lifting height and span, etc.
2. According to the processing productivity of incinerators, the two Grab garbage cranes are needed, one for garbage handling, and the other one for backup.
3. Due to the air pollution and toxic gases in the refuse storage pit, the Grab garbage crane operator cabin is usually designed as fixed type which is used with the control room.
4. Due to the high working efficiency and heavy duty of the Grab garbage crane, the main beam of the crane is usually with the properties of multi-use, anti-fatigue and a good full off-track structure or semi-off-track structure, etc.
5. Due to the harsh and dusty environment, which is likely to cause poor contact or fire, the power supply system of the Grab garbage crane adopts cables.

IV. Application

grab crane for waste

V. Packing

packing

Company Profile

company profile3

Certification

certification(1)

customers

Hot Tags: full or half automatic control wte crane grab crane for waste to energy plants, China, factory, manufacturers, suppliers, made in China

 

Related Products